Minutes, IBIS Quality Committee 17 Apr 2007 11-12 AM EST (8-9 AM PST) ROLL CALL Adam Tambone Barry Katz Benny Lazer Benjamin P Silva * Bob Ross, Teraspeed Consulting Group Brian Arsenault * David Banas, Xilinx Eckhard Lenski Eric Brock Gregory R Edlund Hazem Hegazy John Figueroa John Angulo Katja Koller Kevin Fisher Kim Helliwell, LSI Logic Lance Wang Lynne Green * Mike LaBonte, Cisco Moshiul Haque, Micron Technology Peter LaFlamme Radovan Vuletic, Qimonda Robert Haller * Roy Leventhal, Leventhal Design & Communications Sherif Hammad Todd Westerhoff Tom Dagostino Kazuyoshi Shoji Sadahiro Nonoyama Everyone in attendance marked by * NOTE: "AR" = Action Required. -----------------------MINUTES --------------------------- Mike LaBonte conducted the meeting. AR Review: - Mike change 3.2.1 to suggest use of Terminator Model_type - done - Mike remove 3.1.3 from IQ spec - done - Mike remove 3.2.2 from IQ spec - done - Mike remove 3.2.3 from IQ spec - done - Kim merge 3.2.5 into 3.2.4 - done - Kim noted that the title line was not updated in the released document AR: Mike update title line for 3.2.5 to match that provided by Kim New items: - It was mentioned that Michael Mirmak has suggested having technical presentations in IBIS open forum teleconferences - Where would the documents be stored? - IF the IQ group presents we would store on our own web page. - Would the presentations overlap with IBIS summits? - The next summit June 5. - Not sure if we would give the same presentation twice. - Status of IBISCHK bugs submitted by our group: - Bob said they have both been approved. - IBISCHK has been recently updated and should have the fixes. - We can wait a while to file new bugs, since there may not be another update soon. - David is considering a summit presentation about SiSoft - Bob pointed out that it has to be vendor neutral. - David may be able to craft a different presentation. - Mike said that previously David and Roy were collaborating on a validation paper that was to be presented at the last summit. Continued review of the IQ specification: - 3.2.5. {LEVEL 2} [Pin] RLC parasitics are validated against data sheet - Bob felt the text was too prescriptive: "The ideal is that the parasitics should either be measured or extracted using a 2D or 3D solver." AR: Mike remove "2D or 3D field solver" sentence from 3.2.5 - 3.3.1. {LEVEL 2} [Diff Pin] referenced pins exist - IBISCHK already checks this. - We agreed to delete this check. AR: Mike delete check 3.3.1 - 3.3.2. {LEVEL 2} [Diff Pin] Vdiff and Tskew complete and reasonable - This should be level 3 - David suggested we should not allow zero values - Tskew is actually Tdelay_typ, Tdelay_min, Tdelay_max in the IBIS spec. - Tdelay has typ/min/max - Vdiff does not, which corner should be used? - Worst-case (loosest) value is used - Xilinx IBIS files have Vdiff=100mV or over even though buffers are actually 50mV - This is done to match the relevant standards AR: Mike change 3.3.2 to level 3 Next meeting: 24 Apr 2007 11-12 AM EST (8-9 AM PST) Phone: 1.877.384.0543 or 1.800.743.7560 Passcode: 90437837 Meeting ended at 12:01 PM Eastern Time.